Previous Next work

Wastewater treatment plant in metalworks factory

Completed works:

  • Earthmoving;
  • Reinforced concrete;
  • Sanitation and electrical infrastructures;
  • Electromechanical equipment;
  • Hydrocarbon gradings and pH stabilization systems;
  • Deactivation of pumping stations;
  • Steel structures.

Client

Amtrol Alfa

Location

Guimarães

Activity

infrastructures

reinforced concrete

Duration

4 months